About
A factory that builds one thing really well
Shenzhen Shuangni Environmental Technology has been making electrostatic precipitators since 2015. Not a catalogue of ventilation equipment with an ESP in it — an engineering shop whose entire output is the cell, the cabinet around it and the stages either side.
- Founded 2015, Shenzhen
- 8,000 m² factory, Dongguan
- 200+ models, 50+ patents
- 80+ export markets
The company was set up in 2015 to do one thing that the ventilation trade in southern China was doing badly: treating cooking exhaust at the source, in the duct, rather than pushing it up a stack and hoping the plume dispersed. The first products were plate-type electrostatic cells for wok ranges in Shenzhen and Guangzhou, sized by hand from a burner count and a duct diameter.
Eleven years later the range covers 4,000 to 64,000 m³/h across thirteen ducted models, plus the water spray stage for solid fuel, the carbon stage for odour, a self-cleaning cabinet and an integrated hood for sites with no duct at all. The engineering logic has not changed. A cell with uniform 7.5 mm spacing, a supply that holds voltage as grease builds, and a cabinet that can actually be opened and washed will outperform anything more complicated.
What has changed is the paperwork. CE marking under the Low Voltage and EMC directives, and ISO 9001 for the quality system — because the enquiries that reach us now come from consultants and contractors who have to file those documents before a product can be specified.
What we are not
We are not the cheapest cabinet on Alibaba and we do not try to be. The difference between a cell built to 7.5 mm ± 0.8 mm and one built to ±3 mm is invisible in a quotation and obvious in a kitchen eighteen months later, when one still reads 95% on a test and the other reads 60%. Most of the manufacturing cost sits in things a photograph does not show: the twelve-pass forming of the plates, the jig that holds the spacing, the insulation, the supply and the testing before the cabinet is closed.
Manufacturing
The tolerance is the product
Field strength between two plates is voltage divided by distance. That makes plate spacing the single most important dimension in the whole cabinet — and the hardest one to hold, because it has to be held across every plate in the cell, over a 195 mm depth, on 0.8 mm stainless that moves when it is welded.
The plates are formed in twelve press passes rather than four or six, because the additional passes are what remove the spring-back that would otherwise open and close the gap along the length of each plate. They are then stacked in a jig, not assembled freehand, and the finished cell is checked with a gauge before it goes into a cabinet. Cells that fail the gauge are re-stacked; they are not shipped with a note.
- 7.5 mm nominal spacing, ±0.8 mm across the whole cell
- 195 mm adsorption width per plate pair
- 0.8 mm stainless, twelve-pass formed
- Every cabinet run and checked before packing

Cells on rails, doors that open fully, a drain you can reach. Maintenance access is a design decision, not a detail.
Certification
The paperwork a consultant needs
Two documents carry the weight when a cabinet has to be specified into a project rather than bought off a shelf: the CE file for the electrical build, and the quality system behind it.
CE — Attestation of Conformity
UDEM M.2026.206.C134360. EU Low Voltage Directive 2014/35/EU and EMC Directive 2014/30/EU. Valid to 27 January 2031.
UDEM International Certification, Ankara, Türkiye
ISO 9001:2015
F06726Q03456R0S3, IAF-MLA / IAS accredited, covering design and sales of electrostatic catering fume purification equipment. Valid to 13 September 2029.
ACM International Certification, London, UK
The CE file covers the electrical safety and electromagnetic compatibility of the cabinet. It is not a performance certificate and does not replace a local discharge test — no manufacturer’s document does. Where a project requires an independent emission test on site, we will attend it.

A KL-D-J cabinet in a duct run, upstream of the fan, on the negative-pressure side.
How we work
Four questions, then a drawing
Most enquiries arrive as a photograph and a complaint. The useful ones get turned into a specification in four steps, and none of them requires you to buy anything first.
Airflow
From the cooking equipment: burner count, wok stations, hood length. We apply the same rates the calculator uses, plus a margin, and tell you the figure rather than a range.
Stage chain
From what is in the exhaust and what the permit says. Gas cooking needs the cell. Charcoal needs water first. Odour at a neighbour needs carbon last.
Pressure and fan
Duct friction, bends as equivalent length, plus the cabinet’s 107–176 Pa. A fan that cannot hold the duty starves the cell, and a starved cell smokes however good it is.
Drawing
Cabinet dimensions, flange sizes, clearances for cell removal, drain position and electrical supply. Sent as a PDF the installer can work from.
OEM and ODM
Built to your standard, badged as yours
A large share of what leaves the factory carries someone else’s name. Distributors, ventilation contractors and private-label brands buy cabinets built to their flange dimensions and their colour, with their manual and their logo on the panel.
The useful conversation is not about a catalogue but about your installation standard: what duct sizes your fitters use, what clearance they expect for cell removal, what maintenance model you sell. Those three answers decide the cabinet more than any marketing material.
- Flange dimensions and cabinet orientation to your standard
- Private label panels, manuals and packaging
- Spare cells, power supplies and filters held for your account
- Certification documents handled for your market
- Minimum order quantities that make sense for a first container

Assembly and test, Dongguan. Every cabinet is run before it is packed.
Company facts
- Head office
- Shenzhen, Guangdong
- Factory
- Dongguan, Guangdong
- info@souniny.com
- Phone
- +86 189 2910 1713
Next step
Send the layout. We will confirm the model.
Appliance list, hood length and the duct route are enough to come back with a model, an airflow figure and a drawing. OEM and ODM enquiries welcome.



