ESP filters 4,000–64,000 m³/h · CE certified · ISO 9001 · Shipping to 80+ countries

info@souniny.com / WhatsApp +86 189 2910 1713

Ecology system rooftop installation: three treatment modules connected by ducting

Ecology System · H-type tower / W-type inline

Ecology System — water, ESP and carbon in one train

Not another box: the four stages a difficult kitchen actually needs, ordered, sized and supplied together. Water filter, electrostatic cell, blower and V-bank carbon, built as a vertical tower where roof space is tight and as an inline run where the duct is long.

  • 4,000–64,000 m³/h
  • Water + ESP + carbon
  • Vertical or inline
  • CE components
  • SeriesEcology System
  • ModelsH-type tower / W-type inline
  • Duty4,000 – 64,000 m³/h
  • CertificationCE

Overview

What the Ecology System is built for

A kitchen exhaust problem is rarely one problem. A grill produces heat, coarse grease, sub-micron smoke and smell at the same time, and each of those is handled by a different physical process. No single box does all four well. What the trade calls an ecology system — eco unit, eco package, PCU, depending on the market — is that set of processes arranged in a fixed order and sold as one assembly.

The order is the engineering. Water comes first: a water curtain cools the plume, takes out the coarse grease and quenches sparks, which is what protects everything behind it. The electrostatic cell comes second, where it can work on sub-micron smoke without being coated in grease within a week. The blower comes third, drawing the whole train rather than pushing it. Carbon comes last, and only after the grease is gone, because activated carbon blinds on oil and does nothing useful once it has.

Two layouts carry the same sequence. The H-type stacks all four stages in a vertical tower, which is the answer when the roof is small and the discharge has to go up. The W-type puts the modules in a line on a frame, which is the answer when the roof is long, when each stage needs access from both sides, or when a stage has to be added later. Airflow in the table below is the rating of the ESP cell inside the train; the casing, blower and carbon bed are sized on the loaded resistance of the whole sequence and confirmed on the approved drawing.

Ecology system structure: water circulating filter, ESP purifier, blower and V-bank activated carbon filter stacked in a vertical tower
Inside the H-type tower, bottom to top: 1 water circulating filter · 2 ESP purifier · 3 blower · 4 V-bank activated carbon filter. The same four stages sit side by side in the W-type inline layout.

At a glance

Series
Ecology System
Models
H-type tower / W-type inline
Airflow / duty
4,000 – 64,000 m³/h
Certification
CE (LVD + EMC)
Supply
220 V / 50 Hz

Need the full datasheet with drawings and test references? Ask and we will send it with the quotation.

Engineering

Design decisions that show up in service

What matters more on a real installation than on a specification sheet.

01

One package, one number

Four units from four suppliers means four guarantees and nobody accountable for the stack. Supplied as a train, the number that matters — what leaves the discharge — belongs to one supplier, and the blower is matched to the resistance of the stages it actually sits behind.

02

The order protects the expensive stage

Water in front of the cell is what keeps the cell clean enough to hold efficiency between washes. Carbon behind the cell is what keeps the carbon alive. Reverse either and the running cost moves from labour to consumables.

03

Vertical when the roof is small

The H-type puts water, cell, blower and carbon in one footprint and discharges vertically from the top. It is the configuration for a high-rise where the plant room is a corner of the roof and the duct run to the parapet does not exist.

04

Inline when the run is long

The W-type lays the modules out on a frame, so each one has a door on both sides and a stage can be inserted later without rebuilding the assembly. On a supermarket or food-court roof this is usually the cheaper service access over the life of the plant.

05

Sized on loaded resistance

A blower picked against clean-cell pressure drop will lose airflow as the cell loads. The fan here is selected against the resistance of a dirty ESP plus a saturated carbon bed, so the discharge rate at the end of the service interval is still the design rate.

06

Each stage keeps its own interval

Water stage on a roughly two-week wash, cell on its normal cycle, carbon on a scheduled swap. Because the stages are separate modules, one being serviced does not shut down the others.

Specifications

Ecology System model range

ConfigurationMax airflow (m³/h)StagesESP cell insideTypical site
H-type tower8,000Water + ESP + blower + carbonKL-D-J80Rooftop with one small footprint
H-type tower12,000Water + ESP + blower + carbonKL-D-J120Single kitchen, tight roof
H-type tower16,000Water + ESP + blower + carbonKL-D-J160High-rise, no long duct run
W-type inline16,000ESP + blower + carbon (water optional)KL-D-J160Long roof run, access both sides
W-type inline32,000ESP + blower + carbon (water optional)KL-D-J320Food court, shared roof
W-type inline64,000ESP + blower + carbonKL-D-J640Industrial canteen, central plant

The airflow figure is the rating of the electrostatic cell inside the train. Casing, blower and carbon bed are sized on the loaded pressure drop of the complete sequence and confirmed on the approved drawing, because a 20 m duct run and a 3 m run are not the same fan. The component stages are the ones we build separately: KL-D-SPL for water, KL-D-J for the cell, KL-D-W for carbon where odour is the complaint.

Applications

Where this series fits — and which model to take

The recommended model is the configuration we would quote for a standard layout; longer, split or stacked runs are quoted on drawing.

Rooftop restaurant with neighbours

Visible smoke and cooking smell are the two complaints that close a roof terrace. Both stages exist in the same package.

Recommended: H-type, 8,000–12,000 m³/h

Mall and food-court roofs

Several tenants sharing one discharge point, where a single accountable assembly is easier to permit and to maintain.

Recommended: W-type, 32,000 m³/h

Charcoal grill and BBQ

Sparks, ash and radiant heat: the case where the water stage is not optional and the carbon stage earns its place.

Recommended: H-type or W-type with water stage

Hotel kitchens in dense blocks

Little roof, high discharge, residents above. Vertical tower with carbon at the top.

Recommended: H-type, 12,000–16,000 m³/h

Cloud-kitchen clusters

Many small kitchens on one floor plate discharging through a shared riser, with duty that changes as tenants change.

Recommended: W-type, 16,000–32,000 m³/h

Industrial and staff canteens

Long operating hours at high airflow, where the loaded-resistance blower choice is what holds the extract rate.

Recommended: W-type, 64,000 m³/h

FAQ

Ecology System questions, answered

Is an ecology system just an ESP with extras?

The cell is the same cell. What changes is that the water stage in front and the carbon stage behind are chosen and sized with it, so the cell is not asked to do work it cannot do and the carbon is not killed by grease. An ESP alone will meet a particulate limit; it will not meet an odour complaint.

Can the carbon stage be added later?

Yes, and on the W-type that is a normal sequence: install water and ESP first, add carbon when the odour complaint arrives. The frame and duct are laid out with the space for it. On the H-type tower the top bay is the one to reserve.

Which layout should I choose?

Vertical (H-type) if roof area is the constraint and the discharge goes straight up. Inline (W-type) if the roof is long, if a stage may be added later, or if maintenance access from both sides matters more than footprint. Above roughly 16,000 m³/h the inline layout is usually the practical one.

Does it need a separate fan?

No. The blower is part of the train and is selected against the loaded resistance of the stages behind it. If the duct run is long or has several bends, tell us the run at quotation stage — it changes the fan, not the stages.

What maintenance does it actually need?

Water stage washed on roughly a two-week interval depending on grease load, cell cleaned on the standard ESP cycle, carbon replaced when the odour breaks through rather than on a calendar. Each stage has its own access door so the work is done one module at a time.

Next step

Send the layout. We will confirm the model.

Appliance list, hood length and the duct route are enough to come back with a model, an airflow figure and a drawing. OEM and ODM enquiries welcome.

Size it in 30 seconds Chat on WhatsApp

Typical reply within one working day · MOQ 1 unit