Installing an ESP filter: the seven decisions

A correctly sized cabinet installed badly performs like an undersized one. Most of what decides the outcome is settled before the unit is lifted into place — position in the run, which side of the fan, and whether anyone can physically get the cell out afterwards.

Short answer. Upstream of the fan, on the negative-pressure side, with at least one duct diameter of straight run before the inlet and enough space in front of the access doors to pull a cell out — the cell is the length of the cabinet, so that clearance is not optional. Drain to a grease trap, electrical supply to a dedicated isolator, and the cabinet earthed independently of the duct.

The cabinet itself arrives tested. What cannot be tested at the factory is the installation, and the installation is where most of the performance goes missing. These seven decisions cover the ones that actually move the number.

1. Which side of the fan

The ESP goes before the fan, on the suction side. Three reasons, in order of importance:

  • Leaks pull in, not out. A cabinet under negative pressure leaks air inward. Under positive pressure it leaks grease vapour into the plant room — onto the walls, the electrics and whoever is standing there.
  • The fan stays clean. A fan downstream of the cell moves treated air. A fan upstream moves raw grease and becomes unbalanced, noisy and eventually a fire risk.
  • Efficiency improves. Slightly lower absolute pressure in the cell aids ionisation and reduces the tendency to arc in humid conditions.

The exception is a water spray stage, which also sits upstream, and a carbon stage, which usually sits after the fan because the fan adds a little heat and the carbon lasts longer on cooled gas. Both arrangements are covered in the application notes.

2. Straight run before the inlet

Allow at least one duct diameter of straight run ahead of the cabinet inlet, and the same after the outlet. Closer than that and the airflow arrives at the cell face skewed — fast on one side, slow on the other — and the cell collects well where it is fast and poorly where it is slow. The visible result is a plume from one corner of the discharge even though the unit is the right size.

Where space does not allow it, an internal equalising screen or a turning-vane elbow mitigates most of the problem. Tell us at the drawing stage rather than discovering it at commissioning.

3. Clearance to remove the cell

This is the one that gets designed out and cannot be retrofitted. The cell slides out along the cabinet's long axis and is roughly the length of the cabinet — a KL-D-J320 cell needs about 1.6 m of clear space in front of the doors, plus room for a person. A cabinet installed with 400 mm to a wall is a cabinet that will never be washed.

Add to that: the doors have to open fully (not just enough for a hand), and the drain valve has to be reachable without dismantling anything. If the installation is in a ceiling void, put an access hatch directly above the doors and make sure it is big enough to pass the cell.

Electrostatic precipitator installation diagram showing duct connections, clearances and drain position
Inlet and outlet flanges, cell removal direction and drain. All three have to be respected; any one of them ignored and the cabinet is a maintenance problem for its whole life.

4. Orientation and drainage

Horizontal airflow is standard. Vertical airflow is possible on most models but changes the drain arrangement, because grease has to leave the cabinet against the direction of the cell. Ask before ordering rather than after.

The drain goes to a grease trap, not to a foul drain and never to a rainwater drain. It should fall continuously from the cabinet — a drain that runs uphill for 200 mm will hold water, and water in the cabinet is how insulators fail. Fit an accessible valve and a trap that can be cleaned without tools.

5. Electrical supply

220 V / 50 Hz single phase across the KL-D-J range, 300 W to 2,400 W depending on model. Three things beyond the supply itself:

  • A dedicated isolator adjacent to the cabinet, lockable, marked as the point of isolation for the high voltage.
  • The cabinet earthed independently of the duct. Duct joints are not an earth path, whatever the drawing says.
  • The electrical section is IP65 and separated from the gas path — do not drill it for cable entries in a way that breaks that separation. Use the gland plate.

Interlocking is built in: opening the access door cuts the high voltage before the cell can be reached. Do not bypass it to "test something".

6. Fire strategy

Grease ducts need fire protection regardless of whether an ESP is fitted; the ESP neither removes that requirement nor satisfies it. What the ESP does is reduce the fuel load in the duct substantially — treated air carries 1–2 mg/m³ instead of the raw exhaust — which is why some insurers take a different view of a kitchen with one.

Where the duct crosses a fire compartment, the fire damper or break-in section goes outside the cabinet, not through it. Access panels for duct cleaning must remain accessible after the ESP is installed.

7. Commissioning

Run the unit for an hour before handing it over. What to check:

  1. Voltage and current at their normal working point, recorded on the panel or in the log.
  2. No arcing at full airflow. Arcing at commissioning means moisture, a swarf bridge or a damaged plate — all fixable, all worse later.
  3. Measured airflow at the hood within 10% of the design figure. This catches a fan that cannot deliver, which is the most common hidden defect.
  4. Drain runs freely with the cabinet wet.
  5. Doors seal, interlocks operate, isolator isolates.

The five mistakes, condensed

  • Downstream of the fan — pressurised cabinet, greasy plant room.
  • No cell-removal clearance — the cabinet is never washed, so it never performs.
  • Elbow directly at the inlet — skewed airflow, one-sided collection, visible plume.
  • Drain without fall, or to the wrong drain — standing water, failed insulators, blocked trap.
  • Duct used as earth — intermittent faults that are almost impossible to trace.

Send us the layout before it is built and we will mark the clearances and the drain on it. It takes ten minutes and prevents four of the five. Send a drawing.

Next step

Send the layout. We will confirm the model.

Appliance list, hood length and the duct route are enough to come back with a model, an airflow figure and a drawing. OEM and ODM enquiries welcome.

Size it in 30 seconds Chat on WhatsApp

Typical reply within one working day · MOQ 1 unit