Electrostatic precipitator diagram: every part, labelled

Diagrams of precipitators usually show the physics: a wire, a plate, a particle with a minus sign on it. Useful for an exam, useless for a site visit. This is the other diagram — the one a contractor needs when the cabinet arrives.

Short answer. Exhaust enters at the dirty end through a pre-filter, passes the ioniser, crosses the plate cell, and leaves through the clean end. Below the cell is a sloped sump and drain; above it, insulators and the high-voltage feed from the power pack.

The airflow direction is fixed and the cabinet is handed. Getting that wrong is the most expensive installation mistake there is, because a unit installed backwards cannot be corrected by adjusting anything — the cell faces the wrong way and the access doors open onto a wall.

Dirty end to clean end

Inlet flange. Sized to the duct, usually 925 × 1070 mm on a large double-stack cabinet and proportionally smaller down the range. Bolt pattern matters: a mismatch means a fabricated adaptor and a leak.

Pre-filter. A coarse stainless mesh or baffle that stops fibrous material and large droplets before they reach the ioniser. Cheap, and it doubles the life of everything downstream.

Ioniser. Wires or spikes at around 12 kV across the full duct section. Look for even spacing and no sag: a slack wire changes the field and produces a hot spot that arcs.

Cell. The plate stack, 7.5 mm pitch, on rails. This is the part that comes out for washing.

Outlet. Often with a test port, because the number that matters to a regulator is measured here, not at the hood.

Below and above the airflow

Below the cell sits a sloped floor with a drain spigot. The slope is not decorative: a flat floor holds a pool of grease that re-enters the airstream as soon as the fan speeds up. Above the cell are the insulators carrying the high-voltage rails, and this is the area that decides whether a clean cell still trips.

In a self-cleaning cabinet the same space also holds spray nozzles and a wash pump, and the drain becomes a recirculation sump with a level sensor. Same diagram, more plumbing.

What to check on the drawing before you order

  • Handing. Left or right access, stated explicitly. Do not leave it to the factory.
  • Service clearance. Cell length plus 400 mm, on the access side, at the height of the rails.
  • Drain route. Gravity to a grease trap, with a fall and a trap on the line. A drain that runs uphill is a cabinet that fills up.
  • Fan position. Draw-through, downstream of the cabinet, so the cell runs under negative pressure and leaks go inward.

The one dimension people forget

Height. A double-stack cabinet is around 1.8 m tall plus the base frame, and it has to come out of the same hole it went into. Check the stair, the lift and the ceiling void before the drawing is signed — the alternative is a crane and a very long day.

Every dimension in this walk-through is listed per model on the electrostatic precipitator data sheets, including flange sizes and weights, so the layout can be drawn before anything is ordered.

A kitchen ESP is only as good as its weakest gasket, which is why the cabinet on the front page is built around service access rather than looks.

Next step

Send the layout. We will confirm the model.

Appliance list, hood length and the duct route are enough to come back with a model, an airflow figure and a drawing. OEM and ODM enquiries welcome.

Size it in 30 seconds Chat on WhatsApp

Typical reply within one working day · MOQ 1 unit