ESP emission control solutions: from condition to equipment

Emission conditions are written in outcomes, not equipment. The translation step — from a sentence in a consent to a model number — is where projects either get specified properly or buy something expensive that does not satisfy the inspector.

Short answer. Translate the condition into an outlet concentration and, where relevant, an odour limit at the discharge point. Then choose the train: grease stage, odour stage if needed, and a stack that disperses what remains.

What conditions usually say

Three forms, in order of frequency: no visible fume at the boundary; an odour limit at the nearest sensitive receptor; or a numeric particulate limit in mg/m³ at the discharge. Occasionally all three.

Only the third is directly checkable with a specification sheet. The first two are outcomes that depend on dispersion as much as on filtration.

The translation

No visible fume translates to an outlet around 1–2 mg/m³ of grease aerosol, which is what a two-stage cell delivers at 95–98% removal from a typical 5–30 mg/m³ inlet.

An odour limit translates to a carbon stage sized on dwell time, plus a dispersion calculation for the stack.

A numeric limit translates to a test method and a schedule — without those, the number cannot be demonstrated.

Where the stack does the work

Dispersion is often the cheapest compliance measure available. Increasing stack height or exit velocity can reduce ground-level concentration at the receptor more than an extra filtration stage would, and at a fraction of the running cost. It is also the measure most often omitted because it does not appear on an equipment quote.

Choosing among technologies

  • Visible plume, no odour condition: electrostatic cell, correctly sized.
  • Plume and odour: cell plus carbon, in that order.
  • Odour only, light cooking: carbon with adequate dwell time.
  • Saturated gas, heavy load: wet scrubbing, or a cell designed for the moisture.

What to put in the specification

Airflow, outlet concentration, odour limit where applicable, stack height and exit velocity, and the maintenance regime that keeps the numbers true. The last item is the one inspectors ask about and the one most specifications leave out.

The grease stage of any of those trains is in the ESP filter range, 4,000–64,000 m³/h, with the outlet concentration stated per model rather than as a family average.

If you want the short version of this note, the electrostatic precipitator page summarises the range in a table you can scan in a minute.

Next step

Send the layout. We will confirm the model.

Appliance list, hood length and the duct route are enough to come back with a model, an airflow figure and a drawing. OEM and ODM enquiries welcome.

Size it in 30 seconds Chat on WhatsApp

Typical reply within one working day · MOQ 1 unit