Kitchen exhaust discharge limits: three tests, not one

Almost every cooking-fume condition is written as one of three things: a mass concentration at the stack, a visible-emission threshold, or an odour condition at the nearest receptor. They measure different things, and equipment that satisfies one may not satisfy another.

Short answer. A properly sized and properly washed ESP delivers 95–98% removal and 1–2 mg/m³ at the outlet, which meets a mass-concentration condition on its own and generally removes the visible plume. It does not remove odour — if the condition is about smell at a neighbour, a carbon stage is required on top. Read the wording of the condition before choosing the equipment.

Regulation of commercial cooking exhaust is local almost everywhere. National frameworks set the shape of the requirement, and then municipalities, air districts or planning authorities set the number. That means there is no single figure to design to — but there are only three kinds of test, and knowing which one you are facing decides the specification.

Test one: mass concentration at the outlet

The condition specifies a maximum mass of particulate per cubic metre of exhaust, measured at the discharge. Figures in the region of 1–2 mg/m³ appear in several jurisdictions, usually derived from what a well-maintained electrostatic precipitator achieves.

This is the condition an ESP is designed for. At 95–98% removal and 1–2 mg/m³ at the outlet, a correctly sized unit meets it with margin on a clean cell and stays inside it between washes, provided the wash interval is honoured. It is also the condition that is easiest to test: an isokinetic sample at the stack, a filter, a gravimetric result.

Test two: visible emissions

Some authorities regulate what can be seen rather than what can be weighed, either as an opacity percentage or by comparison with a reference scale. The advantage to the regulator is that it needs no equipment. The advantage to the operator is that a well-run ESP passes it comfortably.

The plume disappears because the particles that scatter light have been removed. In practice a kitchen with a working ESP has no visible discharge in daylight, and the first sign of a failing wash regime is a plume reappearing in cool, humid weather.

Test three: odour at a receptor

This is the one that catches people out, because it is not about the stack at all. The condition is that no nuisance odour be detectable at a specified distance, or at the nearest sensitive receptor — a dwelling, a hotel window, a school, a terrace.

An ESP does nothing for this. Odour is a gas, and the cell collects particles. What an ESP does do, unhelpfully, is remove the visible smoke that was previously carrying the smell, which can make the remaining odour more noticeable to the neighbour rather than less. Sites that install particulate control alone and then get a smell complaint have usually not been mis-sold; they have been given the wrong stage for their condition.

The answer is an activated carbon stage after the cell — around 90% odour removal on the gas that reaches it. Discharge height and position matter as much as the equipment: a stack terminating below a neighbouring window will fail an odour condition that the same unit would pass from roof level.

Rooftop kitchen exhaust discharge stack from a commercial kitchen
Where the stack terminates is part of the compliance case. Treated air still has to be discharged somewhere sensible.

What the paperwork actually proves

Manufacturers publish certifications, and it is worth being precise about what they cover. A CE mark on a cabinet addresses electrical safety and electromagnetic compatibility — it is not a performance claim and it is not an emission certificate. Environmental product certification and a type test report cover the performance of the design under test conditions. Neither is a guarantee of what your installation will emit.

Where a permit requires a measured result, the measurement has to happen on site, on your duct, after commissioning. Ask for the test method at the same time as the condition so that the sampling ports can be built into the duct rather than added afterwards.

Building the case in the right order

  1. Get the condition in writing. The exact wording, not a summary from the contractor.
  2. Identify which of the three tests it is. Mass, visible, or odour — and whether more than one applies.
  3. Size the airflow from the cooking, using the calculator or the rates in the sizing guide.
  4. Add stages only for the conditions that exist. Odour condition: carbon. Solid fuel: water spray. Nothing else.
  5. Plan the wash regime before the order. A unit that will not be washed is a unit that will fail, and the permit does not care whose fault that is.
  6. Test after commissioning, with the sampling points already in the duct.

Where a manufacturer's document stops

We will tell you what the cabinet achieves on a test bench, and we will attend an on-site emission test. We will not tell you that a document satisfies your local authority, because we do not know your local authority. That is a question for whoever wrote the condition, and it is much cheaper to ask it before the equipment is ordered than after it is installed.

Send us the wording and the cooking equipment list and we will come back with the stage chain that meets it, and say plainly if part of the requirement is outside what this technology can do. Start an enquiry.

Next step

Send the layout. We will confirm the model.

Appliance list, hood length and the duct route are enough to come back with a model, an airflow figure and a drawing. OEM and ODM enquiries welcome.

Size it in 30 seconds Chat on WhatsApp

Typical reply within one working day · MOQ 1 unit