Precipitator inspection: what an inspector actually looks at
Inspections rarely fail on engineering. They fail because the cabinet cannot be identified, the wash log does not exist, or the discharge point on the drawing is not the discharge point on the roof.
Short answer. An inspector checks the model and rating against the approval, the wash and service records, the electrical isolation and interlock, the drain route, and the visible discharge. The records are what fail most often.
The four physical checks
Identification. Model plate legible, rating matching the approved drawing. A cabinet with no plate is a cabinet with no provenance.
Isolation and interlock. The isolator has to be identifiable and lockable, and the door interlock has to drop the supply. This is the check most likely to find a real fault.
Drain and grease trap. Route visible, trap accessible, no standing grease in the sump.
Discharge. Where it actually is, what it looks like, and whether it matches the drawing. A relocated terminal is a common and avoidable finding.
The six documents
- Specification sheet for the installed model, with airflow and efficiency.
- Commissioning record with measured airflow and the clean pressure drop.
- Wash log with dates and initials.
- Service records for electrical inspection and any repairs.
- Duct cleaning certificate, if the site is in a regime that requires one.
- Electrical test certificate for the supply.
What fails most often
The wash log. Followed by the commissioning record, which frequently does not exist because nobody measured airflow on the day. Both are cheap to produce and expensive to reconstruct.
Keeping the file
A single labelled folder in the kitchen office, physical or digital, containing the six documents and a photograph of the model plate. Update the wash log weekly. When the visit comes, the inspector spends twenty minutes on site rather than an afternoon asking for paperwork that lives in three different places.
Every electrostatic precipitator we ship arrives with the specification sheet, the commissioning form and the log sheet, because the documentation is part of the product whether or not the buyer asks for it at quotation stage.
If you want the short version of this note, the electrostatic precipitator page summarises the range in a table you can scan in a minute.