Precipitator in a kitchen: the site constraints nobody quotes for

Quotations describe a box with a flange at each end. Buildings have a ceiling void, a doorway, a drain that runs the wrong way and a fan already on the roof. The gap between the two is where projects slip.

Short answer. Before ordering, confirm five things on site: the void height, the drain route and fall, the route the cabinet takes to get in, the clearance to pull the cell out, and whether the fan draws or blows through the cabinet.

None of these are exotic. All of them are cheap to solve at drawing stage and expensive to solve after delivery.

One: void height

A double-stack cabinet runs around 1.8 m tall before the base frame, and it needs headroom above for the high-voltage access and below for the drain. Where the void is tight, a wide single-level unit with more plate area in a flatter box is the answer — which is what the W-suffix wide model is for.

Two: the drain

Gravity, to a grease trap, with a fall. A drain that has to be pumped is a maintenance item that fails silently and turns into a sump full of grease. If the cabinet position cannot reach a trap by gravity, move the cabinet.

Three: the route in

Door widths, stair turns, lift capacity, and the roof hatch if it goes on the roof. A 40,000 m³/h cabinet does not go up a domestic stairwell; it goes up on a crane, and that is a different day, a different permit and a different cost.

Four: service clearance

The cell slides out along its rails. It needs its own length plus about 400 mm, at rail height, on the access side. On a wall-hung installation this is the constraint that forces the whole layout, and it is the one most often discovered after the duct is hung.

Five: draw-through or blow-through

Put the fan downstream of the cabinet. The cabinet then runs under negative pressure, so any leak draws air in rather than pushing greasy air into the ceiling void. A blow-through arrangement pressurises the cabinet and finds every gasket that was not quite tight.

What it means for the drawing

Five checks, thirty minutes, before the order. Every dimension needed for them — height, width, flange, weight, rail length — is on the ESP filter data sheets, including the wide and stacked variants that exist precisely to solve the first constraint.

What separates a kitchen ESP that lasts from one that does not is usually the wash regime, and that is a site decision, not a factory one.

Next step

Send the layout. We will confirm the model.

Appliance list, hood length and the duct route are enough to come back with a model, an airflow figure and a drawing. OEM and ODM enquiries welcome.

Size it in 30 seconds Chat on WhatsApp

Typical reply within one working day · MOQ 1 unit