ESP filters 4,000–64,000 m³/h · CE certified · ISO 9001 · Shipping to 80+ countries

info@souniny.com / WhatsApp +86 189 2910 1713

Note · Maintenance

Precipitator maintenance: the one-page checklist

Maintenance documents are usually written for engineers and read by nobody. This one is written for a supervisor with ten minutes and a torch, because that is the person who will decide whether the interval is kept.

Short answer. Ten checks: drain flow, pre-filter condition, cell seat, insulator cleanliness, door seal, interlock, panel reading, plume, cabinet floor, and the wash log date. If any fails, fix it before the next service.

Before service

1. Drain. Pour a jug of water into the sump. It should disappear in seconds. If it sits, the spigot or the trap is blocked — stop and clear it.

2. Pre-filter. Look through it against a light. If you cannot see light, it needs degreasing; a blinded filter is why the cell loads unevenly.

3. Cabinet floor. Should be damp at most. Standing grease means the drain has been blocked for a while.

During service

4. Plume. Step outside and look at the discharge. Nothing visible in cool weather is the pass mark.

5. Panel. Note the reading on the controller. Compare with yesterday's number on the log, not with the number on the data sheet.

6. Noise. Arcing sounds like a rapid tick or a snap from inside the cabinet. Any new noise is a fault, not a characteristic.

Weekly, with the unit off

7. Cell seat. Pull the cell an inch and push it back. It should slide freely and seat with a firm contact. A cell that rocks is not earthing properly.

8. Insulators. Wipe with a dry cloth. Any brown tracking marks mean replacement, not cleaning.

9. Door seal. Run a hand around the closed door while the fan runs. Feel air? The seal has gone.

Monthly

10. Interlock. Open the door with the unit energised and confirm the supply drops. If it does not, lock the cabinet out and call an engineer the same day.

The log

Date, initials, panel reading, and a tick per check. Two minutes per week, and it turns a warranty conversation into a five-minute call because the history exists.

A copy of this checklist ships inside the access door of every electrostatic precipitator we build, in the language of the destination market, because the person doing check four is not going to read a service manual.

For a first-pass budget, the ESP purifier list gives the model, the airflow and the cabinet size side by side.

Next step

Send the layout. We will confirm the model.

Appliance list, hood length and the duct route are enough to come back with a model, an airflow figure and a drawing. OEM and ODM enquiries welcome.

Size it in 30 seconds Chat on WhatsApp

Typical reply within one working day · MOQ 1 unit